Cuddalore Collector reviews Rs 57 crore flood works
India
Archived — This article has been archived. The information may be outdated.

Cuddalore Collector reviews Rs 57 crore flood works

The Hindu··6 Sept

Cuddalore Collector Sibi Adhithya Senthil Kumar inspected flood mitigation works on September 5, The Hindu reported. He reviewed a Rs 57-crore project strengthening Thenpennaiar banks over 2,900 metres with a 1,270-metre retaining wall. A Rs 14.50-crore flood wall toward the Collectorate is about 95 percent complete. Officials were told to finish before the Northeast monsoon.

Prism

What It Means For You

  • Six villages and 27 Cuddalore Corporation wards are listed as Thenpennaiar beneficiaries.
  • Residents near the Collectorate corridor should see the flood wall finished soon.
  • Melpattampakkam-area farmers are tied to a Rs 63-crore check dam meant to recharge borewells.

What's Happening

  • Inspections covered Gunduuppalavadi, Kandakadu, Thirupathiripuliyur, and Melpattampakkam sites.
  • Works include check-dams, sluices, embankment repairs, and flood-protection walls.
  • A Rs 45-crore package at Pagandai and Thirupathiripuliyur was also reviewed.

What The Projects Cover

  • The Melpattampakkam check dam is expected to benefit 131 borewells across six villages.
  • The same project is projected to irrigate 2,410.12 hectares of farmland.
  • The Collector ordered faster completion to cut inundation risk before monsoon onset.
all-news

More in India