Satellite imagery shows clearing at Chinese dam near Arunachal
Technology

Satellite imagery shows clearing at Chinese dam near Arunachal

Hindustan Times·

Satellite imagery shows villages and farmland cleared at a Chinese hydropower project on the lower Yarlung Tsangpo near Arunachal Pradesh. Earthsense Labs CEO Nirdesh Sharma said construction began in July last year. The project is expected to cost $168 billion with 60 GW installed capacity. India is planning the 11,200 MW Siang Upper Multipurpose Project in Arunachal Pradesh.

Prism

What It Means For You

  • India is planning the 11,200 MW Siang Upper Multipurpose Project in Arunachal Pradesh to offset the Chinese dam's effect on river discharge.
  • Union home minister Amit Shah said last week that concerns would be addressed before the Indian project proceeds.
  • The Yarlung Tsangpo becomes the Siang in Arunachal Pradesh and the Brahmaputra in Assam after joining the Dibang and Lohit.

What's Happening

  • Earthsense Labs released its first report on the Medog Hydropower Project, also called Motuo Dam, on Monday.
  • Imagery at the Mainling high dam site showed villages and fields on the south bank in July last year, then clearing by December and road works on the north bank by August this year.
  • Sharma said a new access road along the north bank and river diversion works are under construction.

Where the River Turns

  • The dam system includes a tunnel across the Great U-Bend, where the Yarlung Tsangpo loops around Namcha Barwa before entering India.
  • The report maps a large dam near Mainling town, a lower dam near Pai town, a tunnel through Namcha Barwa, and an outlet near the India-China border downstream of Medog county.
  • At 60 GW, the installed capacity is three times that of China's Three Gorges Dam, currently described as the world's largest.
all-news