
Business
Archived — This article has been archived. The information may be outdated.
BEML wins Rs 5,400 crore bullet train order
The Indian Express··18 Sept
BEML has secured a Rs 5,400 crore-plus order from NHSRCL to supply and maintain high-speed rolling stock for the Mumbai-Ahmedabad bullet train project. The defence PSU is building India's first B28 trainset at its Aditya High-Speed Rail Complex in Bengaluru. The Railways aims to operate the B28 on the 97-km Surat-Vapi stretch by August 2027.
Prism
What It Means For You
- The first planned B28 service is Surat to Vapi on a 97-km segment of the Mumbai-Ahmedabad corridor.
- Design speed is listed at 280 kmph with an operational speed of 250 kmph, the ministry has said.
- Coaches are described as fully air-conditioned chair cars with reclining seats and onboard infotainment.
What's Happening
- Railway Minister Ashwini Vaishnaw inaugurated the Bengaluru facility on April 25, 2026.
- The ministry has set a target to manufacture the first B28 by March 2027.
- ICF awarded BEML a contract in October 2024 to design, manufacture and commission two high-speed trainsets.
Where the Order Sits in the Project
- NHSRCL placed the Rs 5,400 crore-plus supply and maintenance order for MAHSR rolling stock.
- B28 expands as Bharat-made Bullet at 280 kmph in ministry statements cited by Indian Express.
- Initial operations are planned before the wider Mumbai-Ahmedabad line target of August 2027.
all-news



